Trades Job Check › Concrete cost calculator

Concrete cost calculator: price the pour before you bid

Concrete jobs tie up money longer than most trades: you pay for the crew, forms, pump and concrete up front, then wait on a 90-day holdback. Enter the job and see your break-even, your target price and your price per cubic yard.

What goes into the price

Seven costs every concrete bid has to cover

Crew labourForming, placing, finishing and stripping hours for the whole crew, including waiting on trucks and weather.
Payroll costsEmployer CPP and EI plus 4% vacation pay, roughly 12% on top of wages.
WCBThe 2026 Alberta industry rate for concrete construction is $4.31 per $100 of payroll; use your own rate from your premium notice.
Concrete and rebarReady-mix, rebar, ties, anchor bolts, vapour barrier and curing compound, if you supply them.
Pump, forms and equipmentPump truck, form rentals, vibrators, saws, delivery and disposal.
Your share of overheadTruck, insurance, phone and office spread over the jobs you finish each month.
Waiting to get paidConcrete has a 90-day lien period in Alberta, so holdback is usually held longer than for other trades. The calculator shows how long you carry the costs.
Worked example

Example: a house foundation, 45 cubic yards, you supply the concrete

4 workers × 6 days × 9 hours = 216 crew hours at $35/hour. Overhead of $10,000 a month over 4 jobs. Target margin 15%.

Crew labour with CPP, EI, vacation pay and WCB$8,793
Labour contingency (10%)$879
Materials$11,500
Equipment, fuel and disposal$2,400
Share of overhead$2,500
Cost of waiting to be paid$179
Break-even price$27,452
Price for a 15% margin$32,296
Target price per cubic yard$717.69

These are example numbers to show how the math works, not market prices. Your wages, rates and overhead will be different, so put in your own. WCB uses the 2026 Alberta industry rate for Concrete Construction (42104).

Questions

Concrete pricing questions

How do I price concrete work per cubic yard?

Add up labour with payroll costs and WCB, concrete and rebar, pump and forming costs and your overhead share, add your margin, then divide by the cubic yards poured.

Why does concrete holdback take longer?

In Alberta the lien period for concrete work is 90 days instead of 60, so the holdback is commonly held longer. Pick Concrete in the app and it sets this for you.

Can I add a pump or a sub as its own cost?

Yes. Add rentals line by line and put any trades you hire under subcontractors.

Is it free?

The job check is free. Proposals, invoices and your logo come with Pro, and new accounts get a 14-day Pro trial with no card needed.

Other trades

Check your next concrete job before you bid it.

It takes about two minutes. Then turn it into a proposal with your logo and GST number.

Open the concrete calculator →