Trades Job Check › Plumbing cost calculator

Plumbing cost calculator: know your price per fixture

Plumbing is often quoted per fixture, but rough-in, testing and finish visits add up. Enter the job as you would quote it and see your break-even, target price and price per fixture.

What goes into the price

Seven costs every plumbing bid has to cover

Rough-in and finish hoursUnderground, rough-in, testing and finish visits, plus the travel between them.
Payroll costsEmployer CPP and EI plus 4% vacation pay, roughly 12% on top of wages.
WCBThe 2026 Alberta industry rate for mechanical contracting is $1.83 per $100 of payroll; use your own rate from your premium notice.
Pipe, fittings and fixturesPipe, fittings, valves, water heater and fixtures you supply.
EquipmentCamera, threader, press tools and rentals.
Your share of overheadVan, insurance, phone and office spread over the jobs you finish each month.
Waiting to get paidNew-construction plumbing usually has a holdback. The cash timeline shows when you are paid in full.
Worked example

Example: a new house with 14 fixtures, supply and install

2 plumbers × 7 days × 8 hours = 112 crew hours at $41/hour. Overhead of $9,000 a month over 5 jobs. Target margin 15%.

Crew labour with CPP, EI, vacation pay and WCB$5,227
Labour contingency (10%)$523
Materials$5,200
Equipment, fuel and disposal$350
Share of overhead$1,800
Cost of waiting to be paid$88
Break-even price$13,188
Price for a 15% margin$15,515
Target price per fixture$1,108.21

These are example numbers to show how the math works, not market prices. Your wages, rates and overhead will be different, so put in your own. WCB uses the 2026 Alberta industry rate for Mechanical Contracting (42122).

Questions

Plumbing pricing questions

How do I price plumbing per fixture?

Add up labour with payroll costs and WCB, materials and your overhead share, add your margin, then divide by the number of fixtures.

What about service calls?

Pick "Service and repair" for small jobs paid on completion, with no holdback.

Can I bill rough-in and finish separately?

Yes. Use progress billing on the invoice step.

Is it free?

The job check is free. Proposals, invoices and your logo come with Pro, and new accounts get a 14-day Pro trial with no card needed.

Other trades

Check your next plumbing job before you bid it.

It takes about two minutes. Then turn it into a proposal with your logo and GST number.

Open the plumbing calculator →